These are the top 10 ports that RCL services. They are ranked by frequency of departures and include both international and domestic services.
RCL
Regional Container Lines
RCL is a Shipping Line that provides Ocean based transport and runs regular services to countries such as Singapore, Malaysia, Thailand, China and Hong Kong. The SCAC code for RCL is REGU.

- Website
- rclgroup.com
RCL schedules
Upcoming vessel departures and sailing schedules for Regional Container Lines
Next Departure | Arriving in | Duration | Vessel | Description 19 May 21 May 22 May 24 May 25 May | |
---|---|---|---|---|---|
3 days 6h Direct service | KITI BHUM IMO 9143453 | ||||
1 day 13h Direct service | PANJA BHUM IMO 9338321 | ||||
19hrs Direct service | KHUNA BHUM IMO 9796286 | ||||
9h 10m Direct service | ATI BHUM IMO 9842750 | ||||
8h 45m Direct service | PIYA BHUM IMO 9761449 |
Top 10 ports serviced by this carrier
Rank | Port Code | Port Name | Country | Departure frequency | |
---|---|---|---|---|---|
1 | SGSIN | Singapore | Singapore | Every 1-2 days | More details |
2 | MYPKG | Port Klang | Malaysia | 2-4 times a week | More details |
3 | THLCH | Laem Chabang | Thailand | 2-4 times a week | More details |
4 | CNSHG | Shanghai | China | 2-4 times a week | More details |
5 | THSGZ | Songkhla | Thailand | 2-4 times a week | More details |
6 | CNNGB | Ningbo | China | 2-4 times a week | More details |
7 | CNSHK | Shekou | China | 2-4 times a week | More details |
8 | HKHKG | Hong Kong | Hong Kong | 2-4 times a week | More details |
9 | CNNSA | Nansha | China | 1-2 times a week | More details |
10 | KHKOS | Kampong Saom | Cambodia | 1-2 times a week | More details |
Carrier statistics
#26Global Rank
RCL is ranked 26th in the world against other carriers when comparing service frequency and global port coverage.
On time performance
This chart displays the On Time Arrival performance for RCL as measured by comparing all vessel scheduled vessel arrivals vs actual arrivals.
Apr OTP 30.94%
Previous month OTP 46.85%
Average days late
A vessel is considered late when arriving more than 1 day behind schedule. This chart shows the average number of days that RCL vessels are typically late by.
Apr 4.0 days
Previous month 4.0 days