These are the top 10 ports that CNC Line services. They are ranked by frequency of departures and include both international and domestic services.
CNC Line
ChengLie Navigation Co
CNC Line is a Shipping Line that provides Ocean based transport and runs regular services to countries such as China, Thailand, Singapore, Philippines and Malaysia. The SCAC code for CNC Line is 11DX.

- Website
- cncline.com.tw
CNC Line schedules
Upcoming vessel departures and sailing schedules for ChengLie Navigation Co
Next Departure | Arriving in | Duration | Vessel | Description 6 Jul 8 Jul 10 Jul 12 Jul 13 Jul | |
---|---|---|---|---|---|
5 days 7h Direct service | APL PUSAN IMO 9234123 | ||||
1 day 19h Direct service | PADIAN 3 IMO 9162435 | ||||
2 days 5h Direct service | CNC SATURN IMO 9836684 | ||||
15h 56m Direct service | CNC URANUS IMO 9760627 | ||||
3 days 21h Direct service | VIMC DIAMOND IMO 9330288 |
Top 10 ports serviced by this carrier
Rank | Port Code | Port Name | Country | Departure frequency | |
---|---|---|---|---|---|
1 | CNSHK | Shekou | China | Daily | More details |
2 | THLCH | Laem Chabang | Thailand | Daily | More details |
3 | SGSIN | Singapore | Singapore | Daily | More details |
4 | CNSHG | Shanghai | China | Daily | More details |
5 | CNNSA | Nansha | China | Every 1-2 days | More details |
6 | PHMNL | Manila | Philippines | Every 1-2 days | More details |
7 | MYPKG | Port Klang | Malaysia | Every 1-2 days | More details |
8 | CNNGB | Ningbo | China | Every 1-2 days | More details |
9 | KRPUS | Busan | South Korea | Every 1-2 days | More details |
10 | IDSUB | Surabaya | Indonesia | Every 1-2 days | More details |
Carrier statistics
#16Global Rank
CNC Line is ranked 16th in the world against other carriers when comparing service frequency and global port coverage.
On time performance
This chart displays the On Time Arrival performance for CNC Line as measured by comparing all vessel scheduled vessel arrivals vs actual arrivals.
Jun OTP 42.15%
Previous month OTP 38.51%
Average days late
A vessel is considered late when arriving more than 1 day behind schedule. This chart shows the average number of days that CNC Line vessels are typically late by.
Jun 3.6 days
Previous month 4.4 days