These are the top 10 ports that ZIM services. They are ranked by frequency of departures and include both international and domestic services.
ZIM
ZIM Integrated Shipping
ZIM is a Shipping Line that provides Ocean based transport and runs regular services to countries such as China, The United States, Jamaica, South Korea and Türkiye. The SCAC code for ZIM is ZIMU.

- Website
- zim.com
ZIM schedules
Upcoming vessel departures and sailing schedules for ZIM Integrated Shipping
Next Departure | Arriving in | Duration | Vessel | Description 13 Jul 20 Jul 26 Jul 1 Aug 7 Aug | |
---|---|---|---|---|---|
1 day 4h Direct service | GSL VALERIE IMO 9315874 | ||||
10hrs Direct service | ZIM JADE IMO 9968059 | ||||
6 days 14h Direct service | SUNNY PHOENIX IMO 9227027 | ||||
23 days 23h Direct service | ZIM MOUNT BLANC IMO 9931111 | ||||
1 day 14h Direct service | ZIM AMBER IMO 9967952 |
Top 10 ports serviced by this carrier
Rank | Port Code | Port Name | Country | Departure frequency | |
---|---|---|---|---|---|
1 | CNSHG | Shanghai | China | Daily | More details |
2 | USNYC | New York | The United States | Daily | More details |
3 | JMKIN | Kingston | Jamaica | Every 1-2 days | More details |
4 | CNYTN | Yantian | China | Every 1-2 days | More details |
5 | KRPUS | Busan | South Korea | Every 1-2 days | More details |
6 | TRDRC | Derince | Türkiye | Every 1-2 days | More details |
7 | SGSIN | Singapore | Singapore | Every 1-2 days | More details |
8 | CNNGB | Ningbo | China | Every 1-2 days | More details |
9 | ILASH | Ashdod | Israel | 2-4 times a week | More details |
10 | ESVLC | Valencia | Spain | 2-4 times a week | More details |
Carrier statistics
#15Global Rank
ZIM is ranked 15th in the world against other carriers when comparing service frequency and global port coverage.
On time performance
This chart displays the On Time Arrival performance for ZIM as measured by comparing all vessel scheduled vessel arrivals vs actual arrivals.
Jun OTP 43.44%
Previous month OTP 37.43%
Average days late
A vessel is considered late when arriving more than 1 day behind schedule. This chart shows the average number of days that ZIM vessels are typically late by.
Jun 5.1 days
Previous month 5.7 days